Port of Piombino (LI) Piombino - Province of Livorno (LI)

Environmental Impact Study for the II Modification of Port of Piombino Master Plan

PROJECT DESCRIPTION

The Environmental Impact Assessment Study for the the PRP Variant II of the Port of Piombino requires several updating activities, which take into consideration the related EIA Study, drafted by VDP in 1993, referred to the “Design project of the port of Piombino pier extension”.

PROJECT CHARACTERISTICS

In addition to the documents and canonical contents of the EIA study, the other developed activities are related to:
• coordination of interventions envisaged by PRP variant II including land and sea activity;
• evaluation of the quantities to be dredged according to the different phases and the capacity of the sediment tank to be constructed;
• definition of the sediment tank design characteristics;
• definition of the construction site system organization;
• detailed study regarding the definition of interventions aimed at pollution prevention.