Program of urgent interventions for the safety and restoration of road infrastructure affected by seismic events from 2016- ANAS Arquata del Tronto

PROJECT DESCRIPTION

VDP has followed a careful analysis on the activities of securing and restoring the road infrastructure affected by the exceptional seismic events that have affected the territory of the Marche region since 2016.
The critical points highlighted, following the responses on geotechnical, structural and cognitive surveys, were the subject of intervention that included the drafting of geological reports, Topographical surveys and specialized and graphic drawings for the executive design of the restoration work about the road along the SS685.

SPECIFIC STUDIES

The main actions planned on the different section roads are the following:

- road resurfacing work
- the restoration of safety barriers, including the reconstruction of barrier connections between viaduct and elevated sections;
- Restoration of concrete by cortical removal of damaged concrete
- Restoration of roof tiles
- Protective treatment on concrete with breathable paint product.

Each road sections requires various processes that have been detailed and illustrated in the reports prepared for ANAS. The objective is to restore, repair and improve the road infrastructure that suffered damage during the earthquake in Marche in 2016.