Other services related to:

Environmental studies and permitting

  • Environmental Sustainability

  • Environmental Authorizations (AIA/AUA)

  • Strategic Environmental Assessment and Environmental report

  • Pre-Feasibility Studies

  • Environmental Impact Assessment (EIA)

  • Environmental Implication Assessment

Other categories

The construction sites for the realization of a project may have significant impacts on the environmental components and on resident population. It is therefore generally appropriate to develop a careful analysis of the activities to identify and assess the impacts during construction and, consequently, the best actions to mitigate and / or compensate.

Therefore, the Environmental Project the Construction site is developed during preparation of the final design, and concerns both the construction site, and the affected viability.
At least the following environmental components are analyzed in the Project:
• Surface and underground water;
• Atmosphere;
• Landscape;
• Noise and Vibrations;
• Soil;
• Flora, fauna and ecosystems.

It is possible to take into account other more specific components if they characterize particular contexts of action (for example, particular settlement areas, agricultural contexts that require very focused surveys, etc.).
As part of the activities for the preparation of the Project, is necessary to identify the construction sites, the processing conducted there, the types of equipment used, the paths for vehicles, and the quantities and types of materials handled for the realization of the works.


It will be necessary to analyze the project of the construction site and all the results of any studies and research previously conducted. The necessary data are the followings:

• Construction sites;
• Quarry and disposals sites;
• Construction sites roads system and ordinary roads affected by vehicles around the site;
• Volumes of materials to be moved and their characterization;
• Program of works.

Thanks to the development of the Project it will be possible to establish, where needed:

• Site management methodology
• The monitoring of environmental components;
• The design of mitigation actions.