Project Details

Client:
Regione Sardegna
Location:
Arzachena - Province of Olbia-Tempio (OT)
Project date:
1999
State of activity:
The project received the approval of Sardinia Region on 21/04/2005 with Resolution no.13453

Environmental Impact Study of the entire port basin and of the 1st functional lot of Cannigione – Arzachena (OT) Port

PROJECT DESCRIPTION

The project involves the construction of the tourist port of Cannigione – Arzachena including the following interventions:

  • building of breakwater interventions;
  • lowering of the seabed level;
  • construction of perimeter quays;
  • creation of mooring piers;
  • building of facilities, installation of mooring equipment and construction of yards and paving surfaces.